07
2021-09
Waste Heat Utilization Project
Waste Heat Utilization Project
World’s First 30MW Reheated Pulverized Coal High Efficiency Power StationPakistan DG Khan HUB Cement Plant China’s First Gas Turbine Waste Heat Utilization Project of Compressor StationAnhui Dingyuan Gas Turbine WHR Project of West-to-East Natural Gas Transmission Compressor StationChina’s First Silicon Waste Heat Utilization ProjectYunnan Yongchang Silicon WHR ProjectChina’s First New Vertical Cold Sintering Cooling Equipment with WHR System in Iron and Steel IndustryTianfeng Iron and Steal...
07
2021-09
Sludge Disposal in Urban Sewage Treatment Plants
Sludge Disposal in Urban Sewage Treatment Plants
Sinoma-EC won “the Second Prize of National Science and Technology Progress Award” for independently developing the integration technology——sludge indirect stirring heat drying and compound circulating fluidized bed clean incineration. According to this technology, it formed a set of sludge heat drying disposal system in urban sewage treatment plant which effectively reduced the energy consumption of sludge terminal processing by the efficient utilization of the heat value of sludge itself...
07
2021-09
Sinoma-EC Cooperating with Zhejiang University, CATL and Dynavolt Tech
Sinoma-EC Cooperating with Zhejiang University, CATL and Dynavolt Tech
The industrial energy storage system co-developed by Sinoma-EC, Zhejiang University, Contemporary Amperex Technology Co., Ltd.(CATL), Dynavolt New Energy Technology Co., Ltd.(Dynavolt Tech) and so on mainly includes energy management system (EMS) and power conversion system (PCS). EMS monitors and manages the whole energy storage system to realize the steady/transient-state control function and ensure the safe and reliable operation of the system, while PCS realizes the bidirectional flow of...
07
2021-09
Photovoltaic Power Generation
Photovoltaic Power Generation
The first phase of Lesotho 70MW photovoltaic power station is under construction. Besides, the first phase of Nantong photovoltaic power station has been completed.The test temperature of solar high-temperature air receiver developed by Sinoma-EC reached 900 ℃, which is in a leading position in the field of photothermal technology at home and abroad.Photovoltaic Power Generation Project
07
2021-09
Clean Energy and Environmental  Protection Engineering
Clean Energy and Environmental Protection Engineering
As one of the makers of “National Standard for Regional Energy” and “National Standard for Regional Smart Energy ”, Sinoma-EC has a geothermal energy system integrating feasibility study , design, construction and after-sales operation and maintenance of the project.GSHP System for Buried PipeGround Water Source Heat Pump Project in Beijing Friendship Hotel     NECC Geothermal Pipe Network Project
07
2021-09
Biomass Power Generation
Biomass Power Generation
In addition to the WHR business in traditional cement kilns, Sinoma-EC has been committed to the expansion of energy-saving industries in clean energy fields such as biomass energy, geothermal energy, solar energy and energy storage, and strengthening carbon reduction at the side of power generation.Chicken Manure Solid Waste Comprehensive Treatment Power Station Applicable to Multi-Fuel Turkey Biomass Power Generation Project First Cement  WHR and Biomass Cogeneration Plant in the WorldThailand...
07
2021-09
Saudi Arabia YCC (37MW)  WHR Project
Saudi Arabia YCC (37MW) WHR Project
The Saudi Arabia YCC (37MW) project, the cement kiln WHR project with world’s largest installation scale is selected into the large-scale achievement exhibition “Five Years of Diligence and Endeavor” hosted by the Publicity Department and the National Development and Reform Commission,  rated as 2019 Outstanding Case of  “Excellent Social Responsibility” in Overseas Image Construction of Chinese Enterprises and awarded the honorary title of “Worker Pioneer" in Tianjin.
07
2021-09
Sinoma-EC Tongchuan Yaobai 15MW Pure Low Temperature WHR Project for the Second-generation 10000t/d Cement Clinker Production Line
Sinoma-EC Tongchuan Yaobai 15MW Pure Low Temperature WHR Project for the Second-generation 10000t/d Cement Clinker Production Line
The 15MW WHR project for the 10,000t/d production line of Tongchuan Yaobai has been connected to the grid ahead of schedule 5 months. The project has a high degree of automation and all indicators are in line with the level which is similar with the first-class projects in the world. It is estimated that the annual power generation will reach 102 million kwh, saving 90500 tons of carbon dioxide emission, equivalent to 36300 tons of standard coal, which has good economic and social benefits.