Photovoltaic Power Generation
Source: Date:2021.09.07

The first phase of Lesotho 70MW photovoltaic power station is under construction. Besides, the first phase of Nantong photovoltaic power station has been completed.

The test temperature of solar high-temperature air receiver developed by Sinoma-EC reached 900 ℃, which is in a leading position in the field of photothermal technology at home and abroad.

image.png

Photovoltaic Power Generation Project