PPP ( Public-Private Partnership )
PPP ( Public-Private Partnership )
The government relies on franchising, pricing mechanisms, and financial subsidies to introduce social capital to participate in public energy infrastructure investment, construction and operation, and transfer it to the government upon expiration of cooperation. Compared with BOT/BOOT, it highlights public attributes more, with full life cycle performance as the basis for payment. Mostly used in park integrated energy, waste-to-energy, municipal environmental protection projects. Service Capabilities can output integrated energy solutions for park source-network-load-storage integration. Has engineering strength in waste incineration and biomass power generation.
Detail>
O&M ( Operation and Maintenance )
O&M ( Operation and Maintenance )
The ownership of assets belongs to the owner. Sinoma Energy Conservation accepts entrustment to undertake power station operation, maintenance, spare parts supply, performance optimization, and personnel training; charges fixed operation and maintenance service fees or basic fees plus performance bonuses. Light-asset business, complementing the integrated business chain of investment, construction and operation. Undertakes projects transferred upon expiration of BOOT/BOT and operation and maintenance of third-party stock power stations. Smart Operation and Maintenance relying on overseas branches and industrial internet operation and maintenance platforms, realize remote monitoring, big data analysis, AI intelligent inspection, and condition-based maintenance.
Detail>
EPC+F ( Engineering, Procurement, Construction + Financing )
EPC+F ( Engineering, Procurement, Construction + Financing )
Financing supporting services on the basis of EPC business. In addition to design, procurement and construction work, it also assists the owner in solving construction funds through financial tools such as export credit insurance, seller's credit, and financial leasing, helping owners with greater financial pressure to obtain turnkey projects. The international investment company coordinates financing and links with engineering business. Realize investment driving engineering and engineering feeding back investment. Representative Case: Uzbekistan Navoi Nitrogen Fertilizer Plant Green Energy and Low Carbon Project Contract amount of approximately 1.252 billion yuan, constructing 300 MW photovoltaic with 75 MW/75 MWh energy storage. Establishing a Two-Tier Cross-Border Structure and Fully Implementing the Full Investment-Construction-Operation Chain: A Replicable EPC+F Model in Central...
Detail>
EPC ( Engineering, Procurement and Construction)
EPC ( Engineering, Procurement and Construction)
The contractor is fully responsible for project quality, safety, construction period, and cost, and delivers a turnkey project ready for direct production to the owner. This model does not involve investment; the owner raises all funds by itself, and Sinoma Energy Conservation earns engineering business profits. Relying on the national enterprise technology center, mastering the domestically pioneered cement pure low-temperature waste heat power generation technology. Provides complete sets of equipment for cement, steel, chemical, waste incineration, biomass, etc. Design and manufacturing meet the standards of China, Europe, America, Japan and other countries. Representative Case: Thailand SCG Cement Three Production Lines Waste Heat Power Generation EPC Project Installed capacity of 27 MW, the first export of China's independent low-temperature waste heat power generation complete set ...
Detail>
EMC(Energy Management Contract)
EMC(Energy Management Contract)
Sinoma Energy Conservation signs an energy service agreement with the customer, and our party bears more than 70% of the project investment; during the contract period, the customer pays the project cost with the actual energy-saving benefits generated, and both parties distribute the energy-saving revenue according to the agreed ratio. Upon expiration of the contract, the equipment is given to the customer free of charge. Energy-consuming enterprises can complete energy-saving transformation without or with little investment. Share energy-saving revenue and jointly bear financing risks. Representative Case: Yunnan Yongchang Silicon Industry Energy Performance Contracting Project The Company’s Landmark Implementation Project Funded by IPO Proceeds. Carries out waste heat recovery and energy-saving transformation for the silicon smelting industry, achieving significant energy-saving...
Detail>
BT (Build-Transfer)
BT (Build-Transfer)
The investor completes project financing and engineering construction, and directly transfers all property rights to the owner after completion acceptance, without holding assets or participating in later operation;收益 are obtained through project funds (including financing costs). Short capital occupation time and clear risk boundaries. Suitable for owners with excellent qualifications who hope to directly obtain complete assets. Provides cooperation plans of construction with capital and phased repurchase. Leverages the light-asset investment platform and EPC capabilities to help industrial enterprises with temporarily tight cash flow but good development prospects to implement energy-saving transformation in advance.
Detail>
 BOT (Build-Operate-Transfer)
BOT (Build-Operate-Transfer)
The owner grants a franchise, and the project company completes project construction and operation accordingly; the project is transferred in its entirety upon expiration of the agreed period, without long-term ownership of property rights. This is the earliest applied and most technologically mature investment model of Sinoma Energy Conservation. Covers the entire process from project screening and identification, commercial negotiation, financing arrangement, EPC implementation to operation and transfer. Projects are spread across more than 40 countries worldwide, with nearly 500 clean energy power stations finish construction. Representative Case: UAE United Cement 10,000-ton Cement Line Waste Heat Power Station Project The first overseas project of domestic pure low-temperature waste heat power generation technology with independent intellectual property rights. Supports the local 10...
Detail>
BOOT (Build-Own-Operate-Transfer)
BOOT (Build-Own-Operate-Transfer)
Sinoma Energy Conservation invests in the construction and operation of waste heat power stations, with a franchise period generally of 10-25 years. During the period, investment is recovered and profits are obtained by selling electricity to energy-consuming enterprises; upon expiration of the franchise period, the property rights of the power station are transferred to the owner. Cost Reduction and Win-Win: The electricity sales price is moderately lower than the owner's original electricity purchase price, achieving a win-win situation for both parties. Controllable Risk: Sinoma Energy Conservation bears most of the investment and operation risks and enjoys the power generation收益 during the franchise period. Representative Case: Saudi Arabia Yanbu Cement Waste Heat Power Generation Project Installed capacity of 1×15 MW + 1×22 MW waste heat power generation units, the world's largest...
Detail>
BOO(Build-Own-Operate)
BOO(Build-Own-Operate)
Sinoma Energy Conservation International Investment Co., Ltd. contributes capital to establish a project company, which is responsible for power station investment, design, construction, operation and maintenance. The property rights of the power station belong to the investor permanently and are not transferred to the owner. Project payback rely on long-term electricity and heat sales revenue. Energy-consuming Enterprise: Provides waste heat resources, land access conditions, and makes a commitment to purchase electricity. Sinoma Energy Conservation: Responsible for financing, project full life cycle management, and core technology output. Financial Institution: Participates in building the financing system. Representative Case: Zambia Industrial Park Waste Heat and Photovoltaic Integration Project Total constructing a 36 MWp solar + 7.5 MW WHR hybrid array. Meets 70% of the park's...
Detail>